Completion of the TULIP gas project for GRTgaz
This pilot project included the conversion of pipes used to transport type B gas into type H gas pipes in Northern of France.
For Fives and its subcontractors, the TULIP project represents:
-
an 18-month project
-
14 months of work
-
18,000 hours by Fives Nordon (excluding subcontracted work)
-
13 Transport tests with 21 validated test files
-
7 connections to the existing network + 3 connections between new lines
-
Regassing on time and with no leaks across more than 60 flange connections at 85 bar.
This project is the achievement of a whole team and the result of a great collaboration with GRTgaz (Projects team, design office and operating team).