10/1/2008 

 Supply of 45 flame detectors for the EDF power plant boilers at Blenod (France) 

 

EDF has awarded Fives Pillard a contract for 45 flame detectors (Packscan Safyr type) to be fitted on 3 pulverised coal fired units of 250 MW each, at the Blenod power plant (France), replacing the competitor’s existing detectors.

 

Fives Pillard adds this site to the list of power plants already equipped in France and Belgium:

 

EDF :

 

Cordemais 2 et 3 (2 x 700 MWe)           

Aramon 1 & 2 (2 x 700 MWe)

Porcheville B1 & B2 (2 x 600 MWe)

Martigues (250 MWe)

La Maxe ( 250 MWe, also for a coal application)

 

ELECTRABEL :

 

Ruien (1x 300 MWe)

Les Awirs (1x 300 MWe)

   

 

 

 

 

 

 

 

Packscan Safyr type detector

 

Fives Pillard also has various significant references abroad (Romania, Algeria, Hungary, etc…) thereby confirming the design criteria of simplicity and reliability for its flame detectors.

News

12/12/2011: New success for Fives FCB in Brazil

A new success for Fives FCB through the signature...

 >> Read more | More news

10/10/2011: China: SWSS selects Fives for its new Hot Annealing and Pickling line

In August 2011, SWSS (South West Stainless...

 >> Read more | More news

09/12/2011: Fives Nordon wins a new contract for the realization of primary piping for the Fuqing nuclear plant

In July, Fives Nordon signed a contract with NPIC...

 >> Read more | More news

05/16/2011: Saudi White Cement Co – Saudi Arabia – selects Fives FCB to increase the capacity of its white cement production line 1 to 1,000 tpd

Fives FCB started work on the order made by Saudi...

 >> Read more | More news

Careers

INGENIEUR/TECHNCIEN MISE EN SERVICE H/F

INGENIEUR / TECHNICIEN MISE EN ROUTE

 >> Our offers | Read more

Corporate Social Responsibility

As an industrial engineering group, Fives is at...

 >> Read more


Fives Back to home

Fives © 2009