Retrofitting 3 dual-fuel fired 100 t/hr MHI boilers at the plastic materials complex of ENIP at SKIKDA (Algeria) 

In 2003 ENIP sent an inquiry for retrofitting the DCS of 3 x 100 t/hr MHI boilers as follows "supply of a distributed digital control system".

ENIP finally preferred to invest into a global retrofitting including :

putting in conformity all detectors and actuators,

using fail-safe certified PLC,

replacing the existing burners by better performing ones, in automatic operation.

 

Safety was a prioritary goal (the accident of Skikda in January 2004 which made a lot of casualties and deads had been kept in all minds). This is why the new project has been including double safety shut-off valves on all fuels as well as a detection of first defect, and the replacement of all equipment of uncertain reliability.

>> Read more

 

News

04/04/2012: M.Eric Besson, French Minister in charge of Industry, Energy and Digital Economy has visited Fives Cinetic on Thursday 29th of March, during his coming on “Industrie 2012” tradeshow

   Whilst touring the Industrie 2012...

 >> Read more | More news

03/26/2012: Litwin’s Carbo-chemical and Distillation activity is acquired by the Fives group, thus becoming Solios Chemical

On March 1st, 2012 the Fives group...

 >> Read more | More news

Careers

INGENIEUR/TECHNCIEN MISE EN SERVICE H/F

INGENIEUR / TECHNICIEN MISE EN ROUTE

 >> Our offers | Read more

Corporate Social Responsibility

As an industrial engineering group, Fives is at...

 >> Read more


Fives Back to home

Fives © 2009