A complete 3,500 t/d greenfield cement plant including the latest technologies designed by Fives FCB such as a Low-NOx precalciner allowing to reduce drastically the NOx emissions of the kiln line below 500 mg/Nm3 without SNCR system, and a fully automated cement grinding plant with 3 Horomill® offering the highest flexibility, the lowest energy consumption and, a bonus in the desert area where the cement plant shall be built, zero water consumption !